The facility features 11 levels of dry labs, 10 clinical trial rooms, offices, teaching and learning spaces, and a three-storey underground bunker housing its state-of-the-art proton therapy unit. This advanced technology required meticulous design to meet rigorous demands, including radiation shielding and vibration control.
ACURA Group delivered an integrated product solution to address these challenges, providing seismic-rated bracing, modular framing systems, cable trays, brackets, and pipe insulation blocks and clips. These solutions ensured vibration control and seismic compliance, supporting the project’s success. With an impressive 97.6% fill rate and five daily metro delivery runs, ACURA Group guaranteed the timely delivery of all required materials on site.
Set to treat up to 700 patients annually—25% of whom are expected to come from overseas—we take pride in contributing to a facility that redefines healthcare innovation, prioritises sustainability, and enhances accessibility both locally and globally.
Need help with your next major project?
Let's explore your seismic, modular framing, and other requirements together!